For business

Lab moving

A lab is full of costly, sensitive equipment, and every day it's closed costs money. We move labs to a plan made in advance, with packing suited to each instrument and full coordination with your team.

In short: how is a lab moved?

First we build an equipment list and a work order. Your team prepares samples and materials, and we pack, label, move and place each instrument where it belongs.

20+ years of experienceMoves with a guaranteeDedicated packingPlanned in advance

What we move

Lab instruments, microscopes, centrifuges, incubators, lab benches, chemical cabinets, fridges and freezers, fume hoods and biosafety cabinets.

We build the list together

Every item has a place in the plan: which room it leaves, which room it enters, and who disconnects and reconnects it.

Packing for each instrument

Delicate instruments are wrapped in bubble wrap and blankets and go into padded boxes. Large instruments are secured on dollies and loaded carefully.

What your team does

Lab staff move materials, samples and chemicals under your procedures. Your maintenance staff or technician disconnects gas, water and power.

The right truck

Our trucks are enclosed, and heavy and delicate equipment is secured separately so nothing shifts on the road.

Labs all over Israel

From Beer Sheva and Ashkelon, through Rehovot, Ness Ziona, Tel Aviv and Jerusalem, up to Haifa, Yokneam and the Galilee. Within one building, between campuses or between cities.

What's included

What you get with a business move

On-site project manager

On moving day our project manager is on site, coordinates with your representative and makes sure every item reaches its place.

Full move in 24–48 hours

A whole lab or office can move over a weekend, within 24–48 hours, so you are back at work at the start of the week.

Quote from photos and video

Send us a list, photos or a video of the site and both addresses on WhatsApp, and get a quote and a work plan.

How it works

Lab moving in four steps

1. List and video

Send a list, photos and a video of every room.

2. Work plan

Room order, timing and coordination with technicians.

3. Packing and transport

Every instrument wrapped, labeled and secured.

4. Placement

Each item goes to its set room and spot.

Before a lab move: what to prepare

The better the preparation, the shorter and calmer moving day is. Most of it is done together, one to two weeks before the move.

  • An equipment list by room, with dimensions of the large instruments
  • A plan of the new lab: which instrument goes to which room and bench
  • Who disconnects and connects each instrument: the manufacturer's technician, maintenance or lab staff
  • Emptying fridges, freezers and chemical cabinets per your procedures
  • Backing up computers connected to instruments
  • Booking the freight elevator and parking at both buildings

What to watch out for in a lab move

Most damage in a lab move happens in preparation, not on the road: an instrument not locked internally, a part not labeled, or an instrument arriving at a room that isn't ready for it.

  • Lock rotors, heads and trays per the manufacturer before packing
  • Never move an instrument with liquids, bottles or samples inside
  • Label cables and small parts and tape them in a bag to the instrument
  • Check the new room has power, gas and water before the instrument arrives

What moving day looks like

In the morning the crew arrives with dollies, packing materials and an enclosed truck. Packing goes room by room, and every box and instrument gets a label with its destination room and bench. At the new building the heavy instruments and benches go in first, then the boxes, so everything lands straight in its place. By the end of the day your technicians can start connecting.

What affects the cost of a lab move

There's no single price for a lab, because every lab is different. We quote after a list and a video, and for large labs after a detailed call about each room.

  • Number of instruments and rooms
  • Especially heavy, tall or delicate instruments
  • Access: freight elevator, stairs, ramp and distance to the truck
  • Distance between sites and number of work days
  • Evening, weekend or phased work

Planning a lab move? The complete guide has a timeline from 8 weeks before, who is responsible for what, and a downloadable PDF checklist.

Read the complete lab relocation guide →

Get a quote

Request a quote

Type of move

Or email us: info@hovalot-baderech.com

The button opens WhatsApp or email with your details. The site does not store them.

FAQ

Lab moving: common questions

Do you move samples and chemicals?

Lab staff move materials, samples and chemicals under their own procedures. We move instruments, furniture and boxes.

Who calibrates instruments at the new site?

Calibration and checks after the move are the lab's and its technicians' responsibility. We schedule the move so the technician can come right after placement.

Can you move a lab within the same building?

Yes. Moving between floors or rooms also needs a plan, the right dollies and careful work.

Can a lab be moved in phases?

Yes. Room by room or team by team, so part of the lab keeps working during the move.

How do you quote without seeing the lab?

From a list, photos and a video of each room. For large labs we also go through the details with you by phone.

What about fixed lab benches?

Benches attached to walls or utilities must be disconnected first. After that we dismantle, move and reassemble as needed.

How long does a lab move take?

It depends on the amount of equipment. A small lab usually moves in a day, a large one over several days to a set plan.

Is there a guarantee?

Yes, our moves come with a guarantee.

Moving a lab?

Send us a message and we'll get back to you with a quote.

Message us on WhatsApp

Mobile: 052‑413‑4731