Electronics plant relocation
In an electronics plant everything is sensitive: components damaged by static, calibrated test equipment and assembly lines that must restart fast. We plan the move in phases, line by line.
We map stations and equipment, pack components and boards in anti-static packaging and move in phases. Production machines themselves are moved by the manufacturer, and we move everything else.
What we move
ESD stations, assembly benches, test and measurement equipment, component cabinets, parts storage and plant offices.
Static protection
Components, boards and work in progress are packed in anti-static bags and boxes and sorted by line and station.
Test equipment
Calibrated instruments go into padded boxes and travel secured. Recalibration, if needed, is the plant's responsibility.
No production machines
We don't move assembly machines, SMT lines or ovens. The manufacturer moves them, and we coordinate the schedule so everything arrives on time.
Line by line
One line moves, starts running, and only then the next, so production never fully stops.
Component storage
Shelving, pick cabinets and components on reels move to their locations in the new storage.
What's included
What you get with a business move
On-site project manager
On moving day our project manager is on site, coordinates with your representative and makes sure every item reaches its place.
Full move in 24–48 hours
A whole lab or office can move over a weekend, within 24–48 hours, so you are back at work at the start of the week.
Quote from photos and video
Send us a list, photos or a video of the site and both addresses on WhatsApp, and get a quote and a work plan.
How it works
Electronics plant relocation in four steps
1. Mapping
Stations, test equipment, storage and offices.
2. Phased plan
Line order, days and technicians.
3. Move
Anti-static packing, labels, transport.
4. Start-up
Every line in place, production resumes.
Before an electronics plant move
In an electronics plant every item must return to an exact spot. So the plan starts with a layout of the new plant.
- A plan of the new plant: lines, stations, storage and offices
- A list of ESD stations and test equipment per line
- A schedule with the manufacturers moving the production machines
- Enough anti-static packing materials
- Work order: which line moves first
Protecting components from static
Components and boards are sensitive to static electricity. So they're packed in anti-static bags and boxes, sealed and labeled by line and station. Component reels travel in drawers or closed boxes so they don't get mixed up or dirty.
What to watch out for
- Don't mix components from different lines
- Don't move test equipment without padding
- Don't dismantle an ESD station without labeling connections
- Don't start a new line before the previous one is running
What affects the cost
- Number of lines and stations
- Amount of components and stock
- Phased work and special hours
- Access and distance
Get a quote
Request a quote
FAQ
Electronics plant relocation: common questions
Do you move assembly machines?
No. Production and assembly machines are moved by the manufacturer. We move stations, equipment, components, storage and offices.
How are components protected?
Anti-static packaging, closed boxes and sorting by line and station.
Can you move without stopping production?
Yes, in phases: line by line.
Do you move the component store?
Yes. Shelving, pick cabinets and reeled components go to their places in the new store.
Who calibrates test equipment after the move?
The plant or its calibration company. We coordinate times.
Do you move SMT machines?
No. Production and assembly machines are moved by the manufacturer. We move everything else.
Which areas?
All over Israel.
Is there a guarantee?
Yes, our moves come with a guarantee.
Customers say
Customer reviews
Relocating an electronics plant?
Send us a message and we'll get back to you with a quote.
Message us on WhatsAppMobile: 052‑413‑4731