For business
Server room relocation
The server room is the heart of the office. When it's down, everyone is down. So it moves in a short, planned window, fully coordinated with your IT person.
Your IT person shuts down and disconnects the equipment and labels every cable. We pack, secure the racks, move them in an enclosed truck and place each rack where it belongs in the new room.
What we move
Server racks, network cabinets, standalone servers, switches and routers, UPS units, storage systems and network shelving.
Labels first
Before disconnecting, the back of each rack is photographed and every cable and unit labeled, so reconnection is quick and error-free.
Protective packing
Servers removed from racks go into anti-static bags and padded boxes. A rack that stays loaded is secured inside and travels upright.
A short window
Server rooms usually move over a weekend or at night, so systems run from the new site by morning.
IT coordination
Shutdown, disconnection, reconnection and start-up are done by your IT person or provider. We handle removal, transport and placement.
Enclosed truck and securing
Equipment travels in an enclosed truck, strapped to the walls, with padding between racks.
What's included
What you get with a business move
On-site project manager
On moving day our project manager is on site, coordinates with your representative and makes sure every item reaches its place.
Full move in 24–48 hours
A whole lab or office can move over a weekend, within 24–48 hours, so you are back at work at the start of the week.
Quote from photos and video
Send us a list, photos or a video of the site and both addresses on WhatsApp, and get a quote and a work plan.
How it works
Server room relocation in four steps
1. Mapping
List of racks and gear, door and elevator sizes.
2. Plan
Date, time and work order with IT.
3. Transport
Packing, securing, enclosed truck.
4. Placement
Every rack in place; IT connects and starts up.
Before a server room move
Most of the work in a server room move happens before a single cable is unplugged. Your IT person prepares the systems, and we prepare the move.
- A full backup of the systems, and a check that it restores
- Photos of the back of every rack and a label on every cable
- A list of racks, servers and UPS units with dimensions and weight
- Checking the new room has power, cooling and network ready
- A short time window, usually a weekend or night
Loaded rack or empty rack
Some racks can travel with servers inside, if the rack and rails are built for it. When in doubt, servers are removed and packed separately in anti-static bags and padded boxes. The decision is made with your IT person before moving day.
What to watch out for
- Don't disconnect without photos and labels
- Don't leave loose drives in a server
- Don't move UPS units without checking the manufacturer's battery instructions
- Don't plan a move in a busy week without a rollback plan
What affects the cost
- Number of racks and servers
- Loaded or empty racks
- Access, elevators and distance
- Night or weekend work
Get a quote
Request a quote
FAQ
Server room relocation: common questions
Do you disconnect and reconnect the servers?
No. Your IT person handles shutdown and connections. We pack, move and place.
Can a fully loaded rack be moved?
Sometimes, if the rack and rails are built for it. When in doubt, servers are removed and packed separately.
When is the best time to move?
Over a weekend or at night, so work doesn't stop.
How long are systems down?
Depends on size and distance. A small server room usually moves in a few hours; restart is IT's responsibility.
Do you also move the office workstations?
Yes. The server room and the whole office can move under one plan.
Can a server room move within the same building?
Yes, between floors or rooms, with the same preparation.
Which areas?
All over Israel.
Is there a guarantee?
Yes, our moves come with a guarantee.
Customers say
Customer reviews
Moving a server room?
Send us a message and we'll get back to you with a quote.
Message us on WhatsAppMobile: 052‑413‑4731