What to check in the new building before signing

Many move problems start with a contract signed too fast. A few simple checks before signing save surprises.

Technical checks

  • Power connection and its capacity
  • Allowed floor load
  • Height and width of doors and gates
  • Ramps and truck unloading space
  • Ventilation, cooling and compressed air points

Operational checks

  • Truck parking and access
  • Room for storage
  • Staff access and transport

Before the move

Mark on the floor where each line and rack goes, so on move day every item goes straight to its place.

About the service: Warehouse and plant relocation · All business moving

FAQ

What's most important to check?

Power, floor load and openings.

Do you help with the check?

We check access, openings and the route for equipment.

When to mark the floor?

Before move day.