Labs and lab equipment

Lab relocation checklist

A lab move succeeds when everyone knows their role and when. Here's a list to work from, from two months before to a week after.

Two months before

  • Appoint a move lead from the lab
  • Build an equipment list with item number, old room and new room
  • Check power, gas, water and ventilation at the new site
  • Get quotes and set a date

One month before

  • Book technicians for disconnection, reconnection and calibration
  • Plan moving samples and materials per procedures
  • Dispose of equipment that isn't moving
  • Draw a layout of the new lab with each instrument's spot

One week before to moving day

  • Empty fridges and freezers per the plan
  • Label every item with a number and destination room
  • Disconnect instruments in the agreed order
  • Make sure there's truck parking and a reserved elevator

After the move

  • Check every item arrived against the list
  • Start up and test instruments with technicians
  • Test fume hoods and safety cabinets before work
  • Remove packing materials

About the service: Lab moving · All business moving

FAQ

Who should be the move lead?

Someone from the lab who knows the equipment and can make decisions on the day.

How early should we start?

For a large lab two to three months. For a small lab a month is enough.

What's most often forgotten?

Booking technicians in advance. Without them, instruments arrive but don't work.

Want a quote? Send us a list, photos or a video on WhatsApp and we'll come back with a plan.